sayso.Leave
Kellerton Shire Council

Kingfisher Esplanade is being redesigned. Walk it and tell us where it fails.

What you'll do

About 5 minutes · $7
  1. 1Walk 3 places along the street, and say what you'd do at each one
  2. 2Make one choice the council can't avoid making

Nothing is sent until you read it back at the end.

What you can change

  • Where the concept design doesn't work, before it goes to detailed design
  • Whether the path keeps every tree or keeps its width
  • What council hears from under-30s, who were 0% of the last survey

What's already fixed

  • That something is being built here. The road and drainage are failing and the work is going ahead.
  • The width of the street itself. Everything has to fit between the property line and the water.
  • The budget. It's set by the grant and isn't going up.

They also weigh 302 responses from the main community survey · The engineers' condition assessment of the road and drainage · What the grant conditions require council to deliver

Still unknown Whether a cycling provision is a condition of the grant. Council has asked the funding body and hasn't been told. · Whether the raised crossing at Marlin Street is inside this project's scope or the next one.

What Kellerton Shire Council does next

None of this is more questions for you — it's how the decision gets made, and it takes months. You'll be told where it's up to at each step, including if it stops.

Oct 2026up to here

Written up with the main survey results

Being read and written up

Nov 2026

Concept design put back out for comment

More input being sought

11 Nov 2026

Infrastructure Committee

Going to a decision-making body

20 November 2026

You hear back, either way

What changed, and what didn't

Council will publish what young people said at each location alongside the main survey results, and say which changes it made to the concept, by 20 November 2026.

Feb 2027

Detailed design begins

A decision is made